Notes: Brand New Item. Not shipped to AK, HI, APO, FPO, AE.
This manual provides guidance on estimating the energy potential of a hydropower site, selecting a project's installed capacity, determining the need for for the project's output, evaluating hydropower benefits, and estimating powerhouse costs.