ShopSpell

Square Foot and UNIFORMAT Assemblies Estimating [Paperback]

$80.99       (Free Shipping)
100 available
  • Category: Books (Technology & Engineering)
  • Author:  RSMeans
  • Author:  RSMeans
  • ISBN-10:  0876290187
  • ISBN-10:  0876290187
  • ISBN-13:  9780876290187
  • ISBN-13:  9780876290187
  • Publisher:  RSMeans
  • Publisher:  RSMeans
  • Pages:  350
  • Pages:  350
  • Binding:  Paperback
  • Binding:  Paperback
  • Pub Date:  01-Oct-2001
  • Pub Date:  01-Oct-2001
  • SKU:  0876290187-11-MPOD
  • SKU:  0876290187-11-MPOD
  • Item ID: 100889408
  • Seller: ShopSpell
  • Ships in: 2 business days
  • Transit time: Up to 5 business days
  • Delivery by: Mar 31 to Apr 02
  • Notes: Brand New Book. Order Now.
Now completely updated and revised to the UNIFORMAT II classification of estimating, this book is an essential reference for anyone who creates conceptual, construction, or appraisal estimates. You will learn:
  • Time-saving techniques for producing reliable conceptual estimates
  • Step-by-step demonstration of building elements selection and its cost impact on the total budget
  • How to use the RSMeans database for reliable feasibility studies and early project planning

Also included is an overview of the CostWorks CD-ROM Square Foot and Assemblies Estimating software.

Contributors to This Edition.

Introduction.

How to Use This Book.

Chapter 1: Types of Estimates.

Four Types of Estimates.

Time and Cost of Estimating.

Chapter 2: Square Foot and Cubic Foot Estimates.

Using Square Foot/Cubic Foot Cost Data.

Some Examples.

Conclusion.

Chapter 3: Developing Structural Loads.

Developing Loads.

Assembly Versatility.

Soil Bearing Capacity.

Load Requirements.

Conclusion.

Assemblies Estimate: Three-Story Office Building.

Chapter 4: Substructure.

Spread Footings.

Concrete Piers.

Strip Footings.

Grade Beams.

Piles, Pile Caps, and Caissons.

Slab on Grade.

Assemblies Estimate: Three-Story Office Building.

Chapter 5: Superstructure.

Elevated Floor Assemblies.

Considerations in Selecting Foundation and Framing Systems.

Small versus Large Concrete Building.